Ovacık WPP
ESIA Ovacık WPP
ESIA Non-Technical Summary Ovacık WPP
Stakeholder Engagement Plan Ovacık WPP
Critical Habitat Assessment Ovacık WPP
Biodiversity Action Plan Framework
Resettlement Action Plan
Resettlement Action Plan Addendum for ETL
Supplementary Biodiversity Baseline Report
Construction Phase Biodiversity Management Plan
Operation Phase Biodiversity Management Plan
A more comprehensive study than ESIA is conducted to cover all relevant structures within 500 m around every turbine pad area. Major physical environmental parameters such as noise, air quality, shadow flicker etc. are separately modeled/calculated and final impact significances for these receptors are determined. The document called "Nearest Receptor Study" is disclosed on the Environmental and Social Impact Assessment page and can be reached through the following link:
https://yekares2.enerjisauretim.com/en/sustainability#environmental-and-social-assesment