Akköy WPP
ESIA Akköy WPP
ESIA Non-Technical Summary Akköy WPP
Stakeholder Engagement Plan Akköy WPP
Critical Habitat Assessment Akköy WPP
Biodiversity Action Plan Framework
Supplementary Biodiversity Baseline Report
Operation Phase Biodiversity Management Plan
A more comprehensive study than ESIA is conducted to cover all relevant structures within 500 m around every turbine pad area. Major physical environmental parameters such as noise, air quality, shadow flicker etc. are separately modeled/calculated and final impact significances for these receptors are determined. The document called "Nearest Receptor Study" is disclosed on the Environmental and Social Impact Assessment page and can be reached through the following link:
https://yekares2.enerjisauretim.com/en/sustainability#environmental-and-social-assesment