Akköy WPP

Akköy Res

Aydın

25.2 MW

Enercon

Turbine Type

Number of Turbines

6

65.400 tCO₂e/yıl

Annual Avoided Carbon Emission

Akköy RES

ESIA Akköy WPP

ESIA Non-Technical Summary Akköy WPP

Stakeholder Engagement Plan Akköy WPP

Critical Habitat Assessment Akköy WPP

Biodiversity Action Plan Framework

Supplementary Biodiversity Baseline Report

Operation Phase Biodiversity Management Plan


A more comprehensive study than ESIA is conducted to cover all relevant structures within 500 m around every turbine pad area. Major physical environmental parameters such as noise, air quality, shadow flicker etc. are separately modeled/calculated and final impact significances for these receptors are determined. The document called "Nearest Receptor Study" is disclosed on the Environmental and Social Impact Assessment page and can be reached through the following link:

https://yekares2.enerjisauretim.com/en/sustainability#environmental-and-social-assesment

Loading...