Dampınar WPP

Dampınar Res

Aydın

46.2 MW

Enercon

Turbine Type

Number of Turbines

11

119.898 tCO₂e/year

Annual Avoided Carbon Emission

Dampınar RES

ESIA Dampınar WPP

ESIA Non-Technical Summary Dampınar WPP

Stakeholder Engagement Plan Dampınar WPP

Critical Habitat Assessment Dampınar WPP

Biodiversity Action Plan Framework

Resettlement Action Plan

Resettlement Action Plan Addendum for ETL

Supplementary Biodiversity Baseline Report

Construction Phase Biodiversity Management Plan

Operation Phase Biodiversity Management Plan

A more comprehensive study than ESIA is conducted to cover all relevant structures within 500 m around every turbine pad area. Major physical environmental parameters such as noise, air quality, shadow flicker etc. are separately modeled/calculated and final impact significances for these receptors are determined. The document called "Nearest Receptor Study" is disclosed on the Environmental and Social Impact Assessment page and can be reached through the following link:

https://yekares2.enerjisauretim.com/en/sustainability#environmental-and-social-assesment

Loading...